Paver Calculator › Flagstone calculator

Flagstone calculator

Flagstone is sold by the ton and comes in uneven, irregular pieces, so it is estimated by coverage per ton rather than by the piece. Enter your patio and the stone's thickness for a tonnage range; add a path length to count stepping stones.

1 Flagstone patio or path
2 Stepping stones (optional)
Pallet order slip

Flagstone—tons
Base gravel—cu yd
Bedding sand—cu yd
Stepping stones—pcs

How the flagstone calculator works

tons = area × (1 + extra %) ÷ sq ft per ton
(shown as a range, using the high and low coverage for the thickness)

Flagstone coverage depends on how thick the stone is: thinner stone covers more ground per ton. The coverage figures come from the weight of the stone. Most flagstone (sandstone, limestone, bluestone, slate and similar) weighs very roughly 150 to 170 lb per solid cubic foot. A ton of stone 1½ in thick then covers about 2,000 ÷ 160 ÷ (1.5 ÷ 12) = 100 sq ft. Because a pallet of flagstone varies in thickness from piece to piece, the calculator gives a range.

Stone thickness Sq ft per ton (about) Typical use
About 1 in 120–150 Patios on a firm base, thin overlays
About 1½ in 90–110 Most dry-laid patios and paths
About 2 in 70–85 Patios on softer ground, heavier use
2½–3 in 50–60 Stepping stones, drives, wall caps

Worked example

A 12 × 14 ft patio (168 sq ft) in 1½ in flagstone, with 10% extra for fitting the irregular pieces: 168 × 1.1 = 184.8 sq ft. At 110 sq ft per ton that is 1.68 tons; at 90 sq ft per ton, 2.05 tons. Order about 2 tons, and pick the stones yourself if the yard allows it so you get pieces that fit together.

Under it, a 4 in compacted base running 6 in past the edges is (14 + 1) × (12 + 1) × 4 ÷ 12 × 1.2 ÷ 27 = 2.9 cu yd, and 1½ in of bedding sand is 168 × 1.5 ÷ 12 × 1.1 ÷ 27 = 0.86 cu yd.

Stepping stones

stones = ⌊path length in ÷ spacing in⌋ + 1

Example: a 30 ft path with stones 24 in center to center needs 360 ÷ 24 + 1 = 16 stones. With 18 in stones, that leaves 6 in of lawn or gravel between them.

Path length 20 in centers 22 in centers 24 in centers 26 in centers
10 ft 7 6 6 5
20 ft 13 11 11 10
30 ft 19 17 16 14
40 ft 25 22 21 19
50 ft 31 28 26 24

Spacing is personal. Walk the route at a normal pace, mark where your feet land, and measure. Paths used mostly by children, or on a slope, may want closer stones. Each stone sits in a shallow hole on 1 to 2 in of sand so its top is level with or just above the surrounding ground; the calculator allows 2 in of sand under each stone.

Laying a flagstone patio

  1. Base: dig out and compact the soil, add about 4 in of crushed base in lifts, compacted, sloped about ¼ in per foot away from the house. See the paver base calculator and the slope calculator.
  2. Bedding: spread sand or fine screenings. Because flagstone varies in thickness, the bed is usually a little deeper than under pavers, about 1 to 2 in, and you add or scoop out under each stone to level it.
  3. Fit the stones: lay out the big pieces first, then fill in, aiming for joints of a fairly even width. Trim edges with a chisel or a saw where needed.
  4. Joints: fill with sand, stone dust, a wide-joint polymeric sand, or soil and creeping plants. The polymeric sand calculator explains joint fill for narrower joints.

Buying flagstone

Flagstone is sold by the ton or by the pallet, and the price and coverage depend on the stone type, its color and how thick and regular it is. Patio-grade stone is usually sorted by thickness; ask what range of thickness the pallet contains and what coverage the yard sees with it. Irregular stone also comes in sizes, from small pieces that fill gaps to large slabs; a mix is easier to fit.

Coverage per ton is an estimate from typical stone weights. Stone yards often know the coverage they get with each stone they sell; use their figure if it differs.

Isometric illustration of an irregular flagstone patio with a line of stepping stones leading across a lawn to a garden gate

Questions people ask

How much flagstone do I need?
Divide the area, plus about 10 percent for fitting, by the stone's coverage per ton. Flagstone about 1 1/2 in thick covers roughly 90 to 110 sq ft per ton, so a 12 x 14 ft patio (168 sq ft) needs about 1.7 to 2.1 tons.
How many square feet does a ton of flagstone cover?
Roughly 120 to 150 sq ft at about 1 in thick, 90 to 110 sq ft at 1 1/2 in, 70 to 85 sq ft at 2 in and 50 to 60 sq ft at 2 1/2 to 3 in. Stone type and how much it varies in thickness change this, so ask your stone yard for their figure.
How many stepping stones do I need?
Divide the path length in inches by the center-to-center spacing and add one. A 30 ft path at 24 in centers needs 360 / 24 + 1 = 16 stones.
How far apart should stepping stones be?
Set them to match a relaxed step, often around 22 to 26 in center to center for adults. Walk the path at a normal pace and mark where your feet land before setting the stones.
What do you put under flagstone?
For a dry-laid patio, about 4 in of compacted crushed base and 1 to 2 in of sand or fine screenings to bed the uneven stones. Thin flagstone also needs a firm, well-compacted base so it doesn't crack.